![]() |
| Interior. Needs some remodeling in the V berth to make more space, re plumbed all electrical rewired, wood refinished, galley rebuilt and lots of other little things. |
![]() |
| Cold bilge work. Rebuilding some floor supports after finally getting the bilge emptied. The engine needs to be replaced. |




















